![TAEHA PROCON-100 Operation Manual Download Page 8](http://html1.mh-extra.com/html/taeha/procon-100/procon-100_operation-manual_4369632008.webp)
Pro Pump Controller (ProCon-100)
Rev3.6
2023/07/17
8/70
Copyright
©
2023 by TAEHA CORP. All Rights Reserved
2.
Equipment of our company include driving and rotating parts. Install a safety
net on the rotating parts and never approach it during operation.
Precautions for maintenance and inspection
Caution
1.
When cleaning or repairing the equipment, be sure to turn off the power and
check the internal power supply for complete discharging, and then have it
carried out by a qualified maintenance specialist. Maintenance by non-experts
can cause breakdown.
2.
If there is a breakdown of the equipment, do not disassemble the equipment.
Please contact our customer support team.
3.
If dust accumulates on the equipment, it may cause malfunction. Clean up the
equipment periodically. When cleaning, please shut off the external power
completely and check whether the equipment has been fully discharged. There
is a danger of electric shock.
Precautions for disposal
Caution
1.
When this equipment is disposed of, treat it as industrial waste.