To this chapter contents
11. A.C. GENERATOR/STARTING CLUTCH
11-9
A.C. Generator Installation
Install the A.C. Generator stator set onto right
crankcase cover (3 screws).
Install the pulse generator (2 screws).
Tie the wire harness securely onto the indent of
crankcase.
Caution
Make sure that the wire harness is placed under
pulse generator.
Right Crankcase Cover Installation
Install the dowel pin and new gasket.
Remove the water pump cover.
Install the right crankcase cover onto the
crankcase.
Note: Align the water pump shaft indent with the oil
pump shaft.
Assemble the connector bolt and starter pulley on
the right crankcase cover.
2 bolts
Dowel pin
3 bolts
Connector bolt and starter pulley
Assembly 12 bolts on the right case cover.
Summary of Contents for Quad Raider 600
Page 1: ...FOREWORD CONTENTS HOW TO USE THIS MANUAL SERIAL NUMBER Quad Raider 600 SERVICE MANUAL...
Page 5: ...SERIAL NUMBER Home page Contents Frame number Engine number...
Page 48: ...To this chapter contents 3 LUBRICATION SYSTEM Notes 3 9...
Page 61: ...To this chapter contents 4 FUEL SYSTEM 4 13 Notes...
Page 84: ...6 CYLINDER HEAD VALVE 6 17 Notes To this chapter contents...
Page 109: ...8 V BELT DRIVING SYSTEM 8 17 Notes To this chapter contents...
Page 150: ...To this chapter contents 11 A C GENERATOR STARTING CLUTCH 11 11 Note...
Page 172: ...13 COOLING SYSTEM 13 14 NOTES To this chapter contents...
Page 180: ...To this chapter contents 14 BODY COVER NOTES 14 8...
Page 192: ...15 FRONT BRAKE FRONT WHEEL 15 12 To this chapter contents Notes...
Page 224: ...17 REAR BRAKE REAR WHEEL REAR CUSHION 17 19 Notes To this chapter contents...
Page 245: ...18 ELECTRICAL SYSTEM 18 21 Notes To this chapter contents...
Page 246: ...Home page Contents 19 ELECTRICAL DIAGRAM 19 1 19...
Page 247: ...To this chapter contents 19 ELECTRICAL DIAGRAM Notes 19 2...