6. CYLINDER HEAD/VALVE
6-15
Install cam chain on to sprocket and align the
timing mark on the sprocket with the two sprocket
bolt holes and the lower bolt hole of the cylinder
side cover.
Align sprocket bolt hole with camshaft bolt hole.
Tighten the sprocket mounting bolts.
Caution
Make sure timing marks are matched.
Install the cylinder head side cover (3 bolts).
Install the thermostat (2 bolts).
Loosen auto tensioner adjustment bolt and
remove bolt and spring.
Install tensioner and install spring and adjustment
bolt.
Install cylinder head cover (4 bolts).
4 bolts
To this chapter contents
2 bolts
Timing mark
3 bolts
Tensioner adjustment bolt
Thermostat bolts
Summary of Contents for Quad Raider 600
Page 1: ...FOREWORD CONTENTS HOW TO USE THIS MANUAL SERIAL NUMBER Quad Raider 600 SERVICE MANUAL...
Page 5: ...SERIAL NUMBER Home page Contents Frame number Engine number...
Page 48: ...To this chapter contents 3 LUBRICATION SYSTEM Notes 3 9...
Page 61: ...To this chapter contents 4 FUEL SYSTEM 4 13 Notes...
Page 84: ...6 CYLINDER HEAD VALVE 6 17 Notes To this chapter contents...
Page 109: ...8 V BELT DRIVING SYSTEM 8 17 Notes To this chapter contents...
Page 150: ...To this chapter contents 11 A C GENERATOR STARTING CLUTCH 11 11 Note...
Page 172: ...13 COOLING SYSTEM 13 14 NOTES To this chapter contents...
Page 180: ...To this chapter contents 14 BODY COVER NOTES 14 8...
Page 192: ...15 FRONT BRAKE FRONT WHEEL 15 12 To this chapter contents Notes...
Page 224: ...17 REAR BRAKE REAR WHEEL REAR CUSHION 17 19 Notes To this chapter contents...
Page 245: ...18 ELECTRICAL SYSTEM 18 21 Notes To this chapter contents...
Page 246: ...Home page Contents 19 ELECTRICAL DIAGRAM 19 1 19...
Page 247: ...To this chapter contents 19 ELECTRICAL DIAGRAM Notes 19 2...