A-96.250.231 / 130421
AMI Turbitrack
Maintenance
36
6.
Maintenance
6.1. Maintenance Schedule
Preventive maintenance frequency depends on water quality, on the
application, and on national regulations.
6.2. Cleaning the Measuring Chamber
Cleaning
To clean the measuring chamber proceed as follows:
1
Close the sample inlet valve [F] to stop the sample flow.
Every week
Check sample flow.
If necessary
Clean the measuring chamber.
When maintenance
message E068
appears
Replace the humidity absorber.
Recommendation
:
When replacing the humidity absorber,
check also the O-ring of the bayonet lock
cover and replace it if necessary.
A
B
C
Bayonet lock cover
Measuring chamber
Emitter LED
D
E
F
Scattered light sensor
Through beam sensor
Sample inlet valve
A
B
C
D
E
F