A-96.250.231 / 130421
AMI Turbitrack
Installation
16
3.
Installation
3.1. Installation Checklist
On-site require
-
ments
AC variant: 100–240 VAC (
10%), 50/60 Hz (
5%)
DC variant: 10–36 VDC
Power consumption: 35 VA maximum.
Protective earth connection required.
Sample line with a flow rate of 5–20 l/h and a maximum pressure of
10 bar.
Note:
The maximum inlet pressure of 10 bar must never be
exceeded, not even for short time periods. Protect the
instrument from pressure surges in the sample line.
Waste line with pressure free drain.
Installation
Mount the instrument in vertical position.
Display should be at eye level.
Connect the sample inlet and waste lines.
Electrical wiring
Connect all external devices like limit switches, current loops and
pumps, see
.
Connect power cord.
Power-up
Turn on the sample flow and wait until the measuring chamber is
completely filled.
Switch on power.
Instrument
setup
Program all parameters for external devices (interface, etc.).
Program all parameters for instrument operation (limits, alarms)
Run-in time
Let the instrument run at least for 2 hours, better overnight to rinse
out any pollution from transport and manufacturing.
Verification
May be done to prove the instrument functions.
Never perform a verification before the run-in time is over and before
the measuring value is stable.