Modular UPS 25KVA~900KVA User Manual 15
Installation Instruction
3.2 Unloading and Unpacking
3.2.1 Moving and Unpacking of the Cabinet
The steps to move and unpack the cabinet are as follows
:
1.
Check if any damages to the packing. (If any, contact to the carrier)
2.
Transport the equipment to the designated site by forklift, as shown in Fig.3-2.
Fig.3-2 Transport to the designated site
3.
Open the top plate of the steel-edged wooden case with slotted awl and pier,
followed by side boards (see Fig.3-3).
Fig.3-3 Disassemble the case
4.
Remove the protective foam around the cabinet.