Modular UPS 25KVA~900KVA User Manual 19
Installation Instruction
The steps to position the cabinet are as follows
:
1.
Ensure the supporting structure is in good condition and the mounting floor is
smooth and strong.
2.
Retract the anchor bolts by turning them counterclockwise using wrench, the
cabinet is then supported by the four wheels.
3.
Adjust the cabinet to the right position by the supporting wheels.
4.
Put down the anchor bolts by turning them clockwise using wrench, the cabinet is
then supported by the four anchor bolts.
5.
Ensure the four anchor bolts are in the same height and the cabinet is fixed and
immovable.
6.
Positioning done
.
Attention
Auxiliary equipment is needed when the mounting floor is not solid enough to support the cabinet,
which helps distribute the weight over a larger area. For instance, cover the floor with iron plate or
increase the supporting area of the anchor bolts.
3.3.2 Installing Power Module
The installation position of power module is shown in Fig.3-10 .Please install the
power modules following the principle of from bottom to top to prevent inclination of
the cabinet due to high center of gravity. The steps of installing power module are as
follows (Take the 10-slot cabinet as example):
1.
Ensure the cabinet is fixed and no damage to the body and inserting port of the
power module.
2.
Hold the handler and the body of the power module by two persons at each side.
3.
Insert the module in the installation position, and push it into the cabinet
smoothly.
4.
Fix the module to the cabinet though the mounting holes on two sides of the front
plate of the module (See Fig.3-9 at right).
5.
Installing Power Module done.