3-8 ENGINE
ENGINE INSTALLATION
Reinstall the engine in the reverse order of engine removal.
• Install the engine mounting bolts and nuts as shown in the following illustration.
• Tighten the engine mounting nuts to the specified torque.
NOTE:
The engine mounting nuts are self-locking. Once the nuts have been removed, they are no longer of any
use.
"
• Tighten the engine sprocket nut
1
to the specified torque.
#
Engine sprocket nut: 90 N·m (9.0 kgf-m)
Left
Right
40 N.m
(4.0 kgf-m)
65 N.m
(6.5 kgf-m)
40 N.m
(4.0 kgf-m)
41 N.m
(4.1 kgf-m)
41 N.m
(4.1 kgf-m)
88 N.m
(8.8 kgf-m)
The drive chain joint clip should be attached in the
way that the slit end will face opposite to the direction
of travel.
Summary of Contents for RV125
Page 1: ...9 9 5 0 0 3 1 2 3 3 0 1 E...
Page 34: ...PERIODIC MAINTENANCE 2 21...
Page 191: ...ELECTRICAL SYSTEM 6 23 SPEEDOMETER Disassemble the speedometer as follows...
Page 241: ...8 10 RV125K4 K5 04 05 MODELS REAR FENDER INSTALLATION 6 5 N m 0 65 kgf m...
Page 251: ...Printed in Japan K3 K4 K5 K6...