CHASSIS 5-27
• Tighten the front fork lower clamp bolt
1
and front fork cap
bolt
2
to the specified torque.
• Tighten the front fork upper clamp bolt
3
to the specified
torque.
'
Front fork upper clamp bolt: 23 N·m (2.3 kgf-m)
Front fork lower clamp bolt: 33 N·m (3.3 kgf-m)
Front fork cap bolt: 23 N·m (2.3 kgf-m)
• Install the front fender and tighten the mounting bolts tempo-
rarily.
• Install the front brake caliper. (
#
5-14)
• Install the front wheel. (
#
5-8)
• Move the front fork up and down several times, and tighten
the front fender mounting bolts securely.
!
* After assembling the front fork, check each tighten-
ing part for looseness, play and other conditions.
* Check for oil leakage.
Summary of Contents for RV125
Page 1: ...9 9 5 0 0 3 1 2 3 3 0 1 E...
Page 34: ...PERIODIC MAINTENANCE 2 21...
Page 191: ...ELECTRICAL SYSTEM 6 23 SPEEDOMETER Disassemble the speedometer as follows...
Page 241: ...8 10 RV125K4 K5 04 05 MODELS REAR FENDER INSTALLATION 6 5 N m 0 65 kgf m...
Page 251: ...Printed in Japan K3 K4 K5 K6...