YH4
GRAND
VITARA
1. Caliper pin bolts
1. Flexible hose bolt
FRONT BRAKE
5B-9
Caliper
Before installing caliper (cylinder body) to carrier, check to ensure
that guide pin (pin bolt) inserted in each caliper carrier hole can be
moved smoothly in thrust direction.
NOTE:
Where temperature gets as low as –30
_
C in cold weather, use
rubber grease whose viscosity varies very little even at –40
_
C
(–40
_
F).
INSTALLATION
1) Install caliper to caliper carrier.
2) Torque caliper pin bolts to specifications.
Tightening Torque
(a), (b): 27 N
.
m (2.7 kg-m, 20.0 lb-ft)
For TOKICO brake
. .
caliper
(a): 50 N
.
m (5.0 kg-m, 36.5 lb-ft)
For SUMITOMO
. . . . .
(b): 85 N
.
m (8.5 kg-m, 61.5 lb-ft)
ELECTRIC brake
85 N
.
m (8.5 kg-m, 61.5 lb-ft)
caliper
NOTE:
Make sure that boots are fit into groove securely.
3) Install brake flexible hose as shown and torque hose mounting
bolt to specification.
Tightening Torque
(b): 23 N
.
m (2.3 kg-m, 17.0 lb-ft)
4) Torque wheel nuts to specification.
Tightening Torque
(c): 100 N
.
m (10.0 kg-m, 72.5 lb-ft)
5) After completing installation, fill reservoir with brake fluid and
bleed brake system. Perform brake test and check each
installed part for oil leakage.
Summary of Contents for Grand Vitara 1998
Page 225: ...YH4 GRAND VITARA FRONT SUSPENSION 3D 23 TIGHTENING TORQUE SPECIFICATIONS ...
Page 531: ...YH4 GRAND VITARA 8 6 BODY ELECTRICAL SYSTEM POWER SUPPLY DIAGRAM Refer to Section 8A ...
Page 659: ...YH4 GRAND VITARA BODY SERVICE 9 41 1 Side body outer panel A Apply sealant B Brush treatment ...
Page 673: ...YH4 GRAND VITARA BODY SERVICE 9 55 B B C C 2 DOOR MODEL ...