Chapter 4
Firmware and Blade Server Management
4-9
/cpu@37
/cpu@36
/cpu@35
/cpu@34
/cpu@33
/cpu@32
/cpu@31
/cpu@30
/cpu@2f
/cpu@2e
/cpu@2d
/cpu@2c
/cpu@2b
/cpu@2a
/cpu@29
/cpu@28
/cpu@27
/cpu@26
/cpu@25
/cpu@24
/cpu@23
/cpu@22
/cpu@21
/cpu@20
/cpu@1f
/cpu@1e
/cpu@1d
/cpu@1c
/cpu@1b
/cpu@1a
/cpu@19
/cpu@18
/cpu@17
/cpu@16
/cpu@15
/cpu@14
/cpu@13
/cpu@12
/cpu@11
/cpu@10
/cpu@f
/cpu@e
/cpu@d
/cpu@c
/cpu@b
/cpu@a
/cpu@9
CODE EXAMPLE 4-3
show-devs
Command Output
Summary of Contents for Sun Netra CP3260
Page 18: ...xviii Sun Netra CP3260 Blade Server User s Guide April 2009...
Page 23: ...Chapter 1 Introduction 1 5 FIGURE 1 2 Netra CP3260 Blade Server Top View...
Page 24: ...1 6 Netra CP3260 Blade Server User s Guide April 2009...
Page 27: ...Chapter 1 Introduction 1 9 FIGURE 1 3 Netra CP3260 Blade Server in an ATCA Shelf Enclosure...
Page 36: ...1 18 Netra CP3260 Blade Server User s Guide April 2009...
Page 42: ...2 6 Netra CP3260 Blade Server User s Guide April 2009 FIGURE 2 1 FB DIMM Memory Locations...
Page 43: ...Chapter 2 Hardware Installation 2 7...
Page 44: ...2 8 Netra CP3260 Blade Server User s Guide April 2009...
Page 52: ...2 16 Netra CP3260 Blade Server User s Guide April 2009 FIGURE 2 5 TOD Battery Location...
Page 53: ...Chapter 2 Hardware Installation 2 17...
Page 61: ...Chapter 2 Hardware Installation 2 25 FIGURE 2 9 Hot Swap Latch and Hot Swap LED...
Page 62: ...2 26 Netra CP3260 Blade Server User s Guide April 2009...
Page 106: ...5 6 Netra CP3260 Blade Server User s Guide April 2009...
Page 140: ...B 8 Netra CP3260 Blade Server User s Guide April 2009...