Related Information
■
“Electrical Power Requirements” on page 8
Rackmount Checklist
Complete the following checklist prior to installing the server into a rack or cabinet.
TABLE:
Facility Power Checklist
Facility Power Considerations
Yes
No
N/A
Comment
Do you know the required operating voltage
and electric current level of the server?
Are enough power outlets provided within 2
meters (6.5 feet) for each rack?
Do the power outlets have appropriate
socket receptacles?
Will optional ground cables be attached to
the rack?
Are the circuit breakers for the equipment
suitable in terms of voltage and
current-carrying capacities?
Does the power frequency meet the
equipment specifications?
Will system power be delivered from two
separate power grids?
Is there a UPS to power the equipment?
Do you have the minimum required power
sources to support the power load for the
new hardware? Use kilowatt (kW)/kilovolt
(kVA) to express power load.
Summary of Contents for Server X4-2
Page 1: ...Sun Server X4 2 Installation Guide Part No E38019 04 February 2014...
Page 10: ...x Sun Server X4 2 Installation Guide February 2014...
Page 14: ...xiv Sun Server X4 2 Installation Guide February 2014...
Page 18: ...4 Sun Server X4 2 Installation Guide February 2014...
Page 44: ...30 Sun Server X4 2 Installation Guide February 2014...
Page 122: ...108 Sun Server X4 2 Installation Guide February 2014...
Page 162: ...148 Sun Server X4 2 Installation Guide February 2014...
Page 172: ...158 Sun Server X4 2 Installation Guide February 2014...
Page 206: ...192 Sun Server X4 2 Installation Guide February 2014...