4
Operation
Attachments
Load capacity with attachment
The permissible load capacity of the attach-
ment and the allowable load (load capacity
and load moment) of the truck must not be ex-
ceeded by the combination of attachment and
payload. The specifications of the manufac-
turer and supplier of the attachment must be
complied with.
– Observe the residual load capacity rating
plate, see the chapter entitled "Taking up a
load using attachments".
7090_900-001
Releasing the pressure from the
hydraulic system
Prior to assembling attachments, the plug
connectors must be depressurised.
Attachments must only be installed by au-
thorised personnel in accordance with the
information provided by the manufacturer and
supplier of the attachments. After each instal-
lation, the attachment must be checked for
correct function prior to initial commissioning.
NOTE
The pressure release procedure is dependent
on the operating devices for controlling the
hydraulic functions; see the section entitled
"Lifting system operating devices".
NOTE
Before carrying out pressure release, lower
the fork carriage and tilt the lift mast back to
the stop. The key switch must be switched on
to release the pressure from the system, but
do not start the engine.
NOTE
In trucks with the "FleetManager" or "access
authorisation with PIN code" equipment va-
riants, access authorisation must be enabled.
– Switch on the key switch.
– Wait two to three seconds.
192
57348011850 EN - 02/2019 - 11
Summary of Contents for RX70-40
Page 2: ......
Page 4: ......
Page 13: ...1 Foreword ...
Page 33: ...2 Safety ...
Page 66: ...2 Safety Emissions 54 57348011850 EN 02 2019 11 ...
Page 67: ...3 Overviews ...
Page 78: ...3 Overviews Operating devices and display elements 66 57348011850 EN 02 2019 11 ...
Page 79: ...4 Operation ...
Page 320: ...4 Operation Decommissioning 308 57348011850 EN 02 2019 11 ...
Page 321: ...5 Maintenance ...
Page 328: ...5 Maintenance General maintenance information 316 57348011850 EN 02 2019 11 ...
Page 332: ...5 Maintenance General maintenance information 320 57348011850 EN 02 2019 11 ...
Page 334: ...5 Maintenance General maintenance information 322 57348011850 EN 02 2019 11 ...
Page 364: ...5 Maintenance Preserving operational readiness 352 57348011850 EN 02 2019 11 ...
Page 371: ...6 Technical data ...
Page 382: ...6 Technical data Fuse assignment 370 57348011850 EN 02 2019 11 ...
Page 391: ......