Maintenance
5
1000-hour maintenance/yearly maintenance
1
2
2
3
d3911398
Checking the fork arms
CAUTION
Fork arms must not be uneven!
– Always replace both fork arms.
– Check the fork arms (1) for visible deforma-
tion and excessive wear.
No cracks or deformations must be visible on
the fork arms in the area around the fork bend.
Wear must not amount to more than 10% of
the original thickness.
– Check that the locking screws (2) are
present and securely attached.
– Replace any worn or deformed fork arms.
Check the condition and correct operation of
the fork latch:
– Move the locking lever (3) into a vertical
position.
It must be possible to move the fork arm.
– Move the locking lever into a horizontal
position.
The latch must engage in a recess on the fork
carriage. It must not be possible to move the
fork arm.
– Replace faulty fork latches.
Checking the hydraulic oil level
CAUTION
Hydraulic oils are hazardous to your health and are
under pressure during operation.
– Observe the safety regulations for working
with hydraulic oils; see ⇒ Chapter "Hydraulic
– Park the truck securely; see ⇒ Chap-
ter "Parking the truck securely and switch-
– Open the side cover. See chapter entitled
"Opening the side cover".
57348011850 EN - 02/2019 - 11
355
Summary of Contents for RX70-40
Page 2: ......
Page 4: ......
Page 13: ...1 Foreword ...
Page 33: ...2 Safety ...
Page 66: ...2 Safety Emissions 54 57348011850 EN 02 2019 11 ...
Page 67: ...3 Overviews ...
Page 78: ...3 Overviews Operating devices and display elements 66 57348011850 EN 02 2019 11 ...
Page 79: ...4 Operation ...
Page 320: ...4 Operation Decommissioning 308 57348011850 EN 02 2019 11 ...
Page 321: ...5 Maintenance ...
Page 328: ...5 Maintenance General maintenance information 316 57348011850 EN 02 2019 11 ...
Page 332: ...5 Maintenance General maintenance information 320 57348011850 EN 02 2019 11 ...
Page 334: ...5 Maintenance General maintenance information 322 57348011850 EN 02 2019 11 ...
Page 364: ...5 Maintenance Preserving operational readiness 352 57348011850 EN 02 2019 11 ...
Page 371: ...6 Technical data ...
Page 382: ...6 Technical data Fuse assignment 370 57348011850 EN 02 2019 11 ...
Page 391: ......