
Chapter 2 — Initial Configuration
Power On the Array
September 2017
User Guide
—
Spectra Verde Array
39
Wait
while
the
Verde
array
completes
its
power
‐
on
sequence,
which
takes
approximately
four
minutes,
depending
on
the
configuration.
Note:
Do
not
use
the
array’s
front
panel
power
button
to
power
off
the
array.
See
to
reboot
or
shut
down
the
array.
Verde Master Node and Verde Archive Expansion Nodes
If
your
configuration
includes
both
a
Verde
master
node
and
one
or
more
Verde
archive
expansion
nodes,
power
on
the
expansion
node(s)
before
powering
on
the
master
node.
To
power
on
a
Verde
archive
expansion
node,
plug
both
power
cables
on
the
Verde
archive
expansion
node
into
power
outlets
near
the
rear
of
the
chassis.
The
Verde
archive
expansion
node
immediately
powers
on.
Wait
approximately
four
minutes
while
the
expansion
node
initializes
before
powering
on
a
Verde
master
node.
To
power
on
a
Verde
master
node,
remove
the
front
bezel,
and
then
gently
press
the
power
button
on
the
front
panel.
The
power
LED
illuminates
indicating
that
power
is
on.
See
for
more
information
.
Note:
Do
not
use
the
array’s
front
panel
power
button
to
power
off
the
array.
See
to
reboot
or
shut
down
the
array.
Figure 12
Press the power button.
Power
Power LED
button