
Appendix B — HotPair Setup and Configuration
Connect Cables
September 2017
User Guide
—
Spectra Verde Array
181
Primary Master Node
1.
Locate
the
SAS
ports
on
the
back
of
the
primary
master
node
.
If
you
have
more
than
two
expansion
nodes,
additional
SAS
cards
are
installed
in
the
master
node.
2.
Connect
two
SAS
cables
to
any
SAS
ports
on
the
primary
master
node
.
Note:
The
Verde
master
node
and
Verde
expansion
node
SAS
ports
use
a
different
connector.
It
is
not
possible
to
reverse
the
cable.
3.
Connect
one
of
the
cables
to
the
Front Pri
port
on
the
first
expansion
node.
Figure 138
The SAS ports on a Verde master node.
o
Figure 139
The SAS connectors on a Verde expansion node.
SAS ports (4)
SAS connectors