
Operation
When power failure occurs
2-68
WX Ultra Series
Thermo Scientific
Figure 2-17
Ultracentrifuge with the front cover removed
Figure 2-18
Installing the front cover
(7) Turn on the power breaker.
Handle
Vacuum release
screw
Vacuum
chamber
Door unlock wire
Power breaker
M5 hexagon head bolt for
fixing the front cover (4
pcs.)
WARNING
When the centrifuge will not be used for a long time, keep the power breaker
off.
Summary of Contents for WX 100 Ultra
Page 131: ......