
35
9. Configure Micro-grid "wake-up" times
Fig. 73 Configuring Micro-grid "wake-up" times
If the storage system reaches too low of a
charge to remain active until it can charge from
the PV array, it can stop providing power until
preset times to attempt to charge. When these
times occur, the storage system will re-enable the
micro-grid — or output — for seven minutes to
attempt charging from solar power.
▶
Enter the following information:
• Re-enable Micro-grid: Select Yes to enable this
feature, or not to leave it disabled.
• User Input Time One: Set this to the earliest
time you want to attempt charging.
• User Input Time Two: Set this to the next time
you want to attempt charging.
• User Input Time Three: Set this to the final time
you want to attempt charging.
▶
Press "Continue".
10. Configure meters
Fig. 74 Configuring meters
▶
On this step, configure the meter(s) you have
installed.
▶
Verify that 2 meters are already loaded and
configured.
▶
If the addition of meters is required;
▶
Select WM63-M/WM10 if you are using an
EM24 meter (default).
▶
Select whether the meter is a production or
consumption meter.
▶
Select a unique Modbus ID: 4 for production
or 5 for consumption.
▶
Ensure both meters are configured to "Channel
1".
▶
Select your meter setup.
1. Upstream PV meter (rare)
2. Not used
3. Downstream PV meter (factory default)
4. Whole-home self-consumption
(common)
Summary of Contents for eco 10
Page 2: ...Page intentionally left blank ...
Page 4: ...Page intentionally left blank ...
Page 8: ...Page intentionally left blank ...
Page 58: ...o Part No 28058 Rev 6 ...
Page 64: ...Page intentionally left blank ...