Installation
Tools needed
• Wire stripping tool
• #2 Phillips
screwdriver
• Hand drill
• Utility knife
• Measuring tape
• Multimeter
• 10mm socket or
wrench
• 1/8-inch tip
screwdriver
• Spirit level
• Laptop or other Internet-connected device
Installation basic steps
▶
Inspect system for damage.
▶
Prepare installation location.
▶
Install and secure plinth and cabinets.
▶
Complete external wiring connections.
▶
Place and secure battery modules.
▶
Complete all battery module power
connections.
▶
Complete all battery module communication
connections.
▶
Power up and commission system.
Choosing a mounting location
Select a location with the following attributes:
• Ambient temperature between
41°F - 113°F (5°C - 45°C).
• Humidity max. 90%, non-condensing
• Maximum elevation of
9,842 feet (3,000 meters) above sea-level
• Fire safety regulations observed (smoke detector
recommended)
• Free of dust
• Free of corrosive and explosive gases
• Free of vibrations
• Flat surface of sufficient load-bearing capacity
• Easy access for installation team
• Compliant with all NFPA, NEC, and local
building codes
Clearance requirements
Fig. 4 Clearance requirements
Fig. 5 Multiple unit clearance requirements
Clearances are required for maintenance and
ventilation in compliance with NEC regulations.
3’
1’
3’
3’
Summary of Contents for eco 10
Page 2: ...Page intentionally left blank ...
Page 4: ...Page intentionally left blank ...
Page 8: ...Page intentionally left blank ...
Page 58: ...o Part No 28058 Rev 6 ...
Page 64: ...Page intentionally left blank ...