Flue gas pipe horizontal
9.2 Install pellet hose
- Do not kink the hose (observe bending radius of >
30 cm).
- The hose is not UV-resistant (routing outdoors is
not permissible).
- Temperature resistance of the hose < 60°C.
- Route hose as straight as possible. To avoid sag-
ging, use the SOLARFOCUS item
support shell
made of zinc-plated sheet steel
.
- The hose must be attached to the floor at several
points to prevent it from 'floating' upwards (in the
case of floor-mounting, e.g. suction head).
- Observe maximum hose length and delivery height.
Max. hose
length
Max. con-
veying
height
Suction head to di-
verter for suction
heads
10 m
1.0 m
Diverter for suction
heads to boiler
20 m
2.5 m
Total delivery path
30 m
3.5 m
Notes on installing hose
- Always push the end of the hose onto the pipe
connection as far as the stop. The hose will slide
on to the connection pipe better if you apply a little
water to the pipe.
- Tighten hose clamps firmly. (Detachment of the
hose and the intake of false air must be reliably
prevented).
Note on electrical earthing
Cut the required length of hard PVC spiral from
the hose (with a cutter).
Adjust the cable stripping pliers to the thickness of
the metal strand
1
and strip them (as with electri-
cal cables, the strand lies loosely in the hard PVC
spiral, i.e. it can be easily separated from it).
Bend the strand onto the inside of the hose, con-
nect hose.
!
ATTENTION
- The strand and the hose con-
nection pipe/connection nozzles must always
be in conductive electrical contact (scrape off
any existing coating).
Only the suction hose has to be earthed at
both ends (no earthing required for return-air
hose).
9.3 Air supply into the boiler room
- Continuous and adequate ventilation of the boiler
room must be provided. This ensures an adequate
supply of the air necessary for combustion.
- The structural design must comply with the locally
applicable regulations at the installation location.
The minimum effective area of the supply air open-
ings is 200 cm² up to 30 kW, 300 cm² up to 40 kW
and 400 cm² up to 60 kW. This opening must be
non-closable.
- Optimum operation without a lack of oxygen can
only be ensured if these requirements are met.
1
Summary of Contents for Therminator II
Page 39: ...Annex Installation manual therminator II touch 39 9 6 Commissioning log ...
Page 40: ...Annex 40 Installation manual therminator II touch ...
Page 41: ...Annex Installation manual therminator II touch 41 9 7 Customer service order form ...
Page 42: ...Annex 42 Installation manual therminator II touch ...
Page 43: ...Annex Installation manual therminator II touch 43 ...