
Prior to installation
12
Installation manual
thermi
nator
II touch
4
Prior to installation
4.1 Transport, setup
For boiler weight see
Technical Data
,
Removal of boiler parts (stainless steel hopper, fire brick parts, etc.) during transport/setup is not recom-
mended.
4.1.1
Remove boiler covers
4-1_002
Open cladding door
1
.
Lift front cover
2
upwards (no tools re-
quired).
Release the 4 self-tapping screws and
remove the rear cover
3
.
4.1.2
Disassemble the cladding door
4-2_008
Remove cover
3
and disconnect the cables
on the underside of the display.
For each hinge loosen 2 x screws
1
and
remove cladding door
2
.
3
Summary of Contents for Therminator II
Page 39: ...Annex Installation manual therminator II touch 39 9 6 Commissioning log ...
Page 40: ...Annex 40 Installation manual therminator II touch ...
Page 41: ...Annex Installation manual therminator II touch 41 9 7 Customer service order form ...
Page 42: ...Annex 42 Installation manual therminator II touch ...
Page 43: ...Annex Installation manual therminator II touch 43 ...