
Installation
20
Installation manual
thermi
nator
II touch
5-6_017
Mount flange cover
Insert insulation
1
in the opening.
Mount two-part flange cover
2
with 10 x
self-tapping screws M4x10 (TX20)
3
.
5.7 Seal flange in the boiler filling chamber
Only required for the boiler types dual fuel boiler and wood chip boiler. For log wood boilers, factory sealed
on both sides.
5-7_004
In boiler filling chamber: Seal the unused
boiler flange (left or right) with white ceram-
ic fibre mat
1
and stainless steel flange
plate
2
.
Fasten with 2x hex bolts M8x70 (SW13)
3
.
5.8 Intermediate pellet store, 250 litres
Scope of delivery
Intermediate pellet store 250 L, manual filling, art. no.
6214
Quantity Designation
1
Intermediate pellet store Ø700xH1300 mm
1
Split pole geared motor for container auger
1
Connection cable for container auger, length
2.5 m
Cable ties; sticker
Additional items with: Intermediate pellet store 250 L,
with suction system, art. no. 6217
1 Suction turbine incl. seal
1 Connection cable for suction turbine, length 3.2
m
4 Hose clamp Ø56-59 mm
1 Filling level sensor (capacitive)
Filling cham-
ber
Ext.
Summary of Contents for Therminator II
Page 39: ...Annex Installation manual therminator II touch 39 9 6 Commissioning log ...
Page 40: ...Annex 40 Installation manual therminator II touch ...
Page 41: ...Annex Installation manual therminator II touch 41 9 7 Customer service order form ...
Page 42: ...Annex 42 Installation manual therminator II touch ...
Page 43: ...Annex Installation manual therminator II touch 43 ...