
Prior to installation
14
Installation manual
thermi
nator
II touch
4.1.4
Dismantle pallet/wooden poles
4-5_007
thermi
nator
II
– 18 to 40
Loosen 4 hex bolts M16x50 (SW 24)
1
on
the underside of the pallet.
4-6_006
thermi
nator
II
– 49/60
On each side of the boiler, remove 6 x
screw TX 5x40
1
.
4.2 Information about the boiler room
Structural specifications
- The boiler may only be installed in a dry, frost-free room; the permissible room temperature is 5 to 30°C.
- The boiler may only be used on a non-combustible surface with sufficient load-bearing capacity.
- Observe spacing to flammable materials (regional regulations).
- Note the installation dimensions to ensure sufficient space is provided (e.g. for service and maintenance work)
- For normative specifications see Austrian standard ÖNORM H 5170
Summary of Contents for Therminator II
Page 39: ...Annex Installation manual therminator II touch 39 9 6 Commissioning log ...
Page 40: ...Annex 40 Installation manual therminator II touch ...
Page 41: ...Annex Installation manual therminator II touch 41 9 7 Customer service order form ...
Page 42: ...Annex 42 Installation manual therminator II touch ...
Page 43: ...Annex Installation manual therminator II touch 43 ...