![SMC Networks LECPMJ Series Operation Manual Download Page 28](http://html1.mh-extra.com/html/smc-networks/lecpmj-series/lecpmj-series_operation-manual_1299638028.webp)
- 27 -
PC
(The PC should be obtained separately.)
(Please prepare communication cable for CC-Link and PLC by the customer)
(2) Connection with a PC
Controller setting kit
Controller
Conversion unit
CN4
Caution
(1) Do not connect to equipment other than specified (LEC-W1, LEC-W2, LEC-T1, LEC-G).
When connected to equipment, which is not specified, the product will be damaged by incorrect
signal wiring.
(2) When connecting the cable, make sure that no electrically conductive materials are present in
the connector insertion port.
(3) In the LEC-W1, the 0V of the driver and PC is not insulated.
If the 0V and the PC ground are common and the PC ground makes contact with
another voltage, an excessive voltage might be applied to the driver, causing damage to
the driver.
5.4 CN5: Communication plug connector
Controller
Communication cable for CC-Link
CN5
For the wiring method, refer to
"7. CN5: Communication Plug Connector"
.
位 置
速 度
100
500
200
1000
50
200
1
2
3
テスト
テスト
テスト
現在 位 置
120.3
現在 速 度
200
mm
mm/s
動 作中
ア ラーム
モニタ
設定
位 置
速 度
100
500
200
1000
50
200
1
2
3
テスト
テスト
テスト
現在 位 置
120.3
現在 速 度
200
mm
mm/s
動 作中
ア ラーム
モニタ
設定
USB cable
(A-miniB type connector)
PLC
Communication
cable