E93.1601EN032.C VGH installation manual
109
AVOID Breathing Fiber Particulates and Dust
Precautionary Measures:
Do not remove or replace RCF parts or attempt any service work involving RCF without following the guidelines
and wearing the following personal protective equipment outlined in the table (19.1) below:
Avoid the Following
Avoid Contact with the skin and eyes
Avoid breathing in the dust in the combustion chamber
Avoid
transferring the contamination from clothing and items at the job site
Personal Protective
Equipment
Wear
long-sleeved shirt and pants, gloves, and safety goggles
Wear a respirator with a N95 rated filter efficiency or better.
1
Working
Environment
Use water to reduce airborne dust levels when cleaning the combustion
chamber
Do not dry sweep silica dust. Pre-wet or use a vacuum with a high efficiency
HEPA filter
Take all possible steps to provide adequate ventilation in the boiler room
Clean-up
Remove all contaminated clothing after use. Store in sealable container until
cleaned
Wash
contaminated
clothing separately from other laundry
and rinse washing
machine after use to avoid contaminating other clothes.
Wash all exposed body areas gently with soap and water after contact.
Disposal
Discard used RCF components by sealing in an airtight plastic bag. RCF and
crystalline silica are not classified as hazardous wastes in the United States and
Canada.
First aid
If contact with eyes: Flush with water for at least 15 minutes. Seek immediate
medical attention if irritation persists
If contact with skin: Wash affected area gently with soap and water. Seek
immediate medical attention if irritation persists.
If breathing difficulty develops: Leave the area and move to a location with clean
fresh air. Seek immediate medical attention if breathing difficulties persist.
Ingestion: Do not induce vomiting. Drink plenty of water. Seek immediate
medical attention
Notes:
1 R
espirator recommendations based on OSHA and CCOHS requirements at the time this document was
written. Consult your local regulatory authority regarding current requirements for respirators, personal
protective equipment, handling, and disposal of RCF's.
For more information on Refractory Ceramic Fibers, the risks, recommended handling procedures and
acceptable disposal practices contact the organization(s) listed below:
United States (OSHA):
Telephone directory listing
under United States Government - Department of
Labor - Occupational Safety and Health
Administration; or website http://www.osha.gov.
Canada (CCOHS):
Telephone directory listing
under Government Blue Pages Canada - Health
and Safety - Canadian Centre for Occupational
Health and Safety; or website
http://www.ccohs.ca.
Inspection, maintenance and service.
Inspection, maintenance and service including the replacement of boiler parts must only be carried out by a
licensed professional, service agency or the gas supplier. Apart from the maintenance proceedings it is required
to maintain a service log for each boiler that includes all of the following information:
Serial
number
Date and time of maintenance
Name of maintenance engineer
Which parts were exchanged during
maintenance
Which settings (software) were changed during
maintenance
Special remarks / findings
Future aspects that need extra attention
Additional aspects: measurement reports,
complaints by the (end)-user, lock-out codes, etc.
Static Gas Pressure inches W.C.
CO2 % at high fire
Gas Pressure at high fire
Gas Pressure at low fire
pH of the water or water/glycol in the system
name of service company
date of service
Table 19. 1
Summary of Contents for VGH-299-CH
Page 6: ...E93 1601EN032 C VGH installation manual 6 1 SAFETY GUIDELINES ...
Page 59: ...E93 1601EN032 C VGH installation manual 59 Ladder Logic Diagram Figure 11 3 ...
Page 60: ...E93 1601EN032 C VGH installation manual 60 Electrical schematics Figure 11 4 ...
Page 61: ...E93 1601EN032 C VGH installation manual 61 Figure 11 5 ...
Page 123: ...E93 1601EN032 C VGH installation manual 123 22 SPARE PARTS Figure 22 1 ...
Page 124: ...E93 1601EN032 C VGH installation manual 124 Figure 22 2 ...
Page 127: ...E93 1601EN032 C VGH installation manual 127 ...