E93.1601EN032.C VGH installation manual
110
During maintenance, the following
items in bold listed below
of the boiler must be checked and inspected.
NOTICE: Before starting to work on the boiler:
Switch off the electrical power to the boiler (service switch and/or unplug boiler)
Close the gas valve to block gas supply to the boiler
Customer comments
Comments and remarks from the customer must be analyzed and used to find possible causes for any occurring
problems and complaints.
Service history
The operational and fault history (total amount and since the last service)
can be viewed in the boiler control
This information can be used to specify the maintenance and service proceedings in relation to the boiler (parts).
Boiler History
Successful Ignitions 32
Failed Ignitions 10
Flame Failures 0
Operation Days 0 days
▼
Water leakage
The water pressure of the heating installation must be more than 21 psi (1.0 bar) and at a maximum of 45 psi (4.0
bar) in normal operation. When the water pressure drops below the minimum occasionally, there might be a water
leak. Check the boiler and the complete heating installation for any water leakages and have these repaired.
higher water pressures are allowed with the use of a different relief valve and a pressure switch kit
Flue gas & air supply
The flue gas pipes and the air supply pipes must be checked for gas tightness. Also check if the mounting of these
pipes is correct, safe and not damaged. Check the top side of the boiler housing for signs of water leakage and
traces of water coming from the air supply pipe, the air vent or any condensate coming from the flue gas pipes.
Check to ensure the flow there are no obstructions for the exhaust venting or the intake combustion air venting.
Check that all intake and exhaust venting has been properly reassemble and sealed before leaving the job site
Gas supply & safeties
The gas pipes must be checked for gas tightness. Also check if the mounting of these pipes is correct, safe and
not damaged. Any built-in safeties must be checked for a correct functioning. Any gas pipe or fitting that have
been opened or adjusted must be checked for leaks.
Remove complete burner unit
The complete boiler unit consists of the fan, venturi, gas valve, the burner plate and the internal burner. To make
more space to dismantle the complete burner unit pull down the burner controller unit.
To remove this part for an internal heat exchanger check: remove the six M6 nuts, the ignition cable and the
thermal fuse cables. Close the gas tap under the boiler and loosen the gas union by untighten the swivel joint
under the gas valve. Remove the air intake pipe from the venturi.
After this, take out the complete burner unit by moving it forward out of the boiler housing. NOTICE: Watch out
not to damage the burner plate insulation during this operation.
While removing the complete burner unplug both of the electrical and controlling cables of the fan. After all this
dismantle the venturi on the suction side of the fan and check the blade wheel of the fan.
Warning
Crystalline Silica
–
Read instructions of § 19.2 carefully
Checking Non-return Valve (NRV)
The non-return valve is placed directly after the fan and has to be replaced every year during maintenance.
Replace the non-return valve by removing the 4 nuts that are holding the fan. All the parts included in the NRV
maintenance kit must be replaced the gaskets, NRV seat, lock nuts, and non-return valve, do not reuse any of
the old parts.
Reassemble the Non-return valve to the burner unit be sure that the nuts are tightened again so no air/gas mixture
is leaking into the cabinet. Check during startup of the boiler to ensure no gas mixture is leaking on these gaskets
near the non-return valve.
Replace parts 1 to 5 of the check valve once a year.
Needed tools: Wrench 55, 10 and 8 mm, Hex key 5 mm
Picture 19.1
Summary of Contents for VGH-299-CH
Page 6: ...E93 1601EN032 C VGH installation manual 6 1 SAFETY GUIDELINES ...
Page 59: ...E93 1601EN032 C VGH installation manual 59 Ladder Logic Diagram Figure 11 3 ...
Page 60: ...E93 1601EN032 C VGH installation manual 60 Electrical schematics Figure 11 4 ...
Page 61: ...E93 1601EN032 C VGH installation manual 61 Figure 11 5 ...
Page 123: ...E93 1601EN032 C VGH installation manual 123 22 SPARE PARTS Figure 22 1 ...
Page 124: ...E93 1601EN032 C VGH installation manual 124 Figure 22 2 ...
Page 127: ...E93 1601EN032 C VGH installation manual 127 ...