E93.1601EN032.C VGH installation manual
7
This boiler is equipped with a pressure switch in the event of a blocked vent the boiler
will lockout. No attempt by the user/owner may be made to put the boiler back into
operation. A qualified service technician must be notified of the issue. The boiler may
only be reset by a qualified service technician after they have diagnosed and corrected
the issued that caused the safety lockout of the boiler.
“Should overheating occur or the gas supply fail to shut off, do not turn off or disconnect
the electrical supply to the circulator. Instead, shut off the gas supply at a location
external to the appliance.”
Slant/Fin recommends the installation of a carbon monoxide detector in the boiler room
for all installations.
WARNING: There are no user serviceable parts on this boiler. Warranty does not cover
defects caused by attempts to service this boiler by someone other than a qualified gas
service technician. These attempts could cause property damage, personal injury or
loss of life.
WARNING: Improper installation, adjustment, alteration, service or maintenance can
cause property damage, personal injury (exposure to hazardous materials) * or loss of
life. Installation and service must be performed by a qualified installer, service agency
or the gas supplier (who must read and follow the supplied instructions before
installing, servicing, or removing this boiler. This boiler contains materials that have
been identified as carcinogenic, or possibly carcinogenic, to humans)
Do not use this boiler if any part has been under water. Immediately call a qualified
service technician to inspect the boiler and to replace any part of the control system
and any gas control which has been under water
WARNING:
Crystalline Silica
- Certain components in the combustion chamber may
contain this potential carcinogen. Improper installation, adjustment, alteration, service
or maintenance can cause property damage, serious injury (exposure to hazardous
materials) or death. Refer to Section
19
for information on handling instructions and
recommended personal protective equipment. Installation and service must be
performed by a qualified installer, service agency or the gas supplier (who must read
and follow the supplied instructions before installing, servicing, or removing this boiler.
This boiler contains materials that have been identified as carcinogenic, or possibly
carcinogenic, to humans).
CAUTION
DANGER
NOTICE
WARNING
WARNING
DANGER
WARNING
Summary of Contents for VGH-299-CH
Page 6: ...E93 1601EN032 C VGH installation manual 6 1 SAFETY GUIDELINES ...
Page 59: ...E93 1601EN032 C VGH installation manual 59 Ladder Logic Diagram Figure 11 3 ...
Page 60: ...E93 1601EN032 C VGH installation manual 60 Electrical schematics Figure 11 4 ...
Page 61: ...E93 1601EN032 C VGH installation manual 61 Figure 11 5 ...
Page 123: ...E93 1601EN032 C VGH installation manual 123 22 SPARE PARTS Figure 22 1 ...
Page 124: ...E93 1601EN032 C VGH installation manual 124 Figure 22 2 ...
Page 127: ...E93 1601EN032 C VGH installation manual 127 ...