
Section 02 ENGINE
Subsection 06 (E-RAVE SYSTEM)
A35C0DA
Detach cables from E-RAVE shaft pulley
no. 2
.
A35C0EA
Installation
Reverse removal steps. However, pay attention
to the following.
Connect E-RAVE cables as per following photo:
A35C0QA
1
2
CABLE POSITIONS
1. Cable ends in top holes
2. Cable ends in bottom holes
Tighten nut of each cable to E-RAVE shaft pulley
bracket.
Ensure cables are parallel to each other.
A35C0SB
RIGHT
44
mmr2005-148
Summary of Contents for 2005 MACH Z
Page 2: ......
Page 3: ...2005 Shop Manual RT SERIES BOMBARDIER RECREATIONAL PRODUCTS INC...
Page 40: ...Section 02 ENGINE Subsection 02 AIR INTAKE SYSTEM AIR INTAKE SYSTEM A35C02S mmr2005 149 15...
Page 220: ...Section 06 DRIVE SYSTEM Subsection 03 DRIVEN PULLEY A35D1BA Install circlip mmr2005 133 207...
Page 340: ...NOTES...
Page 341: ...NOTES...
Page 342: ...2005 MACH Z RT SUMMIT RT A35Z02...
Page 343: ......