Section 06 DRIVE SYSTEM
Subsection 03 (DRIVEN PULLEY)
A30D0XA
NOTE:
For high altitude regions, a service bulletin
will give information about calibration according to
altitude.
Spring
To check spring preload adjustment, use the
spring scale hook (P/N 529 006 500) and a spring
scale.
529 006 500
Remove drive belt.
Install the hook on the sliding half
no. 12
. Prevent-
ing fixed half from turning, pull sliding half with the
spring scale perpendicularly with pulley axle.
Take first measurement when sliding half begins
to turn. Rotate sliding half to 10 mm (3/8 in) of
rotation. Hold spring scale at this position. Slow-
ly release tension from spring scale and take sec-
ond measurement when sliding half begins to re-
turn. Spring preload is the average measurement
between these 2.
First measurement
(when opening)
+
Second measurement
(when closing)
2
=
Spring
preload
EXAMPLE:
3.8 kg (8.4 lb)
(when opening)
+
3.4 kg (7.5 lb)
(when closing)
2
=
3.6 kg (8 lb)
actual
spring
preload
529 006 500
A01B18A
1
2
TYPICAL
1. Pull for the first measurement
2. Release slowly for the second measurement
To adjust spring preload, relocated spring end in
cam, moving it clockwise to increase the preload
and counterclockwise to decrease it. Refer to
TECHNICAL DATA.
NOTE:
If the spring preload can not be adjusted,
try to relocate the other end of spring in sliding
pulley (holes A, B or C).
mmr2005-133
211
Summary of Contents for 2005 MACH Z
Page 2: ......
Page 3: ...2005 Shop Manual RT SERIES BOMBARDIER RECREATIONAL PRODUCTS INC...
Page 40: ...Section 02 ENGINE Subsection 02 AIR INTAKE SYSTEM AIR INTAKE SYSTEM A35C02S mmr2005 149 15...
Page 220: ...Section 06 DRIVE SYSTEM Subsection 03 DRIVEN PULLEY A35D1BA Install circlip mmr2005 133 207...
Page 340: ...NOTES...
Page 341: ...NOTES...
Page 342: ...2005 MACH Z RT SUMMIT RT A35Z02...
Page 343: ......