5.8
Leak Test
1)
Please make sure that the stop valves of the outdoor unit are closed during the operation.
2)
The leak test should be made by pressurizing nitrogen gas.
3)
Turn on the Hi-knob and Lo-knob. The leak test should be done simultaneously at both the gas and
liquid stop valves.
4)
Open the pressure reducing valve, pressurize the connection pipes to 1.0 MPa (10 bar) slowly, wait
fifteen minutes, and make sure that the pressure will not drop.
5)
Rise the pressure to 4.0 MPa (40 bar) slowly, wait 24 hours, and make sure the pressure will not drop.
6)
If the pressure does not decrease, the pipes have passed the test. Otherwise, look for where the gas leaks
from.
1: Outdoor unit
2: Liquid side stop valve
3: Gas side stop valve
4: Pressure-vacuum gauge
5: Hi-knob
6: Lo-knob
7: Pressure reducing valve
8: Nitrogen
5.9
Vacuum Operation
1)
Make sure that the liquid and gas stop valve of the outdoor unit are closed fully during the operation.
2)
As shown in the following figure, expel the gas from the refrigerant pipes by the vacuum pump.
3)
Open the pump and turn on the knobs to evacuate the gas in the liquid and gas pipes.
The vacuuming
should be done simultaneously at both the gas and liquid stop valves.
4)
When the pressure of the system is less than
-
0.1Mpa (
-
1bar), keep the system for more than one hour
under the condition.
1: Outdoor unit
2: Liquid side stop valve
3: Gas side stop valve
4: Pressure-vacuum gauge
5: Hi-knob
6: Lo-knob
7: Vacuum pump
5)
Turn off the knobs firstly and then the pump, and if the pressure of the pressure-vacuum gauge does not
rise within 2 hours, the system is under a vacuum. Otherwise, the system has leaked, please look for where
the gas leaks in.
46
Summary of Contents for MS-E48AIN
Page 1: ...HIGH POWER MULTI SYSTEM SERVICE MANUAL EN MS E48AIN MS E56AIN Outdoor unit ...
Page 11: ...CONTROL 1 OPERATION FLOWCHART 6 ...
Page 13: ...1 2 Heating Operation 8 ...
Page 47: ... Outdoor unit higher than indoor unit DB DB DB DB 42 ...
Page 70: ...Malfunction display High Pressure Protection 2 1 65 ...
Page 87: ...PARTS GUIDE MS E48AIN MS E56AIN DB2 19SB DB3 19SB DB5 16AF HIGH POWER MULTI SYSTEM ...
Page 88: ...Exploded view of unitMS E48AIN ...
Page 91: ...Exploded view of unitMS E56AIN ...
Page 94: ......
Page 95: ......
Page 96: ......
Page 97: ......