3.9
Installation of the Outdoor Unit
1)
Check the installation location and ensure it is strength and level, so that the unit will not cause any
operating vibration or noise after installation.
2)
In accordance with the foundation drawing in the following figure, please drill 4 holes in the installation
location.
A: The outlet side B: Bottom view (mm) C: Drain hole
3)
Fix the unit securely with the foundation bolts. You can get the M10 or M8 foundation bolts, nuts and
washers from the market.
4)
Rubber or spring shock absorbers should be used during the installation of the outdoor unit to meet the
noise and vibration requirements.
5)
Screw the foundation bolts into the ground and it is better that their length is less than 20mm from the
foundation face.
35
Summary of Contents for MS-E48AIN
Page 1: ...HIGH POWER MULTI SYSTEM SERVICE MANUAL EN MS E48AIN MS E56AIN Outdoor unit ...
Page 11: ...CONTROL 1 OPERATION FLOWCHART 6 ...
Page 13: ...1 2 Heating Operation 8 ...
Page 47: ... Outdoor unit higher than indoor unit DB DB DB DB 42 ...
Page 70: ...Malfunction display High Pressure Protection 2 1 65 ...
Page 87: ...PARTS GUIDE MS E48AIN MS E56AIN DB2 19SB DB3 19SB DB5 16AF HIGH POWER MULTI SYSTEM ...
Page 88: ...Exploded view of unitMS E48AIN ...
Page 91: ...Exploded view of unitMS E56AIN ...
Page 94: ......
Page 95: ......
Page 96: ......
Page 97: ......