install drainage pipe, so that the condensed water can be discharged.
2)
Reference to the size of hanger metal and drill 4 holes in the installation location.
3)
Hang the hanger bolts.
4)
Fix the modules securely with the hanger bolts. You can get the M10 or M8 hanger bolts, nuts and washers
from the market.
5)
Adjusting the nuts position, so that the DB module should be level in front/back and left/right.
39
Summary of Contents for MS-E48AIN
Page 1: ...HIGH POWER MULTI SYSTEM SERVICE MANUAL EN MS E48AIN MS E56AIN Outdoor unit ...
Page 11: ...CONTROL 1 OPERATION FLOWCHART 6 ...
Page 13: ...1 2 Heating Operation 8 ...
Page 47: ... Outdoor unit higher than indoor unit DB DB DB DB 42 ...
Page 70: ...Malfunction display High Pressure Protection 2 1 65 ...
Page 87: ...PARTS GUIDE MS E48AIN MS E56AIN DB2 19SB DB3 19SB DB5 16AF HIGH POWER MULTI SYSTEM ...
Page 88: ...Exploded view of unitMS E48AIN ...
Page 91: ...Exploded view of unitMS E56AIN ...
Page 94: ......
Page 95: ......
Page 96: ......
Page 97: ......