Replace a solenoid that does not pass all of the following
tests.
1. Label and remove all wires from the solenoid, then
remove the solenoid from the tractor.
2. Set the VOM to Ohms. Probe the small posts of the
solenoid (Figure 29). The VOM should read less
than 10 Ohms.
3. Connect the VOM probes to the large posts (Figure
30). The meter should read no continuity.
4. See Figure 31. Probe the mounting base of the sole-
noid. Probe one of the small posts and observe the
VOM. Now probe the other small post. The VOM
should read no continuity in both cases.
5. Apply 12 VDC to the two small posts. There should
be an audible click as the solenoid engages.
6. With the solenoid engaged (12 VDC to the small
posts), measure the resistance at the two large posts.
The VOM should read less than 10 ohms (continuity).
Replace a solenoid that does not pass all tests.
Figure 30. Testing Solenoid Short
Figure 29. Testing Solenoid Resistance
+
-
12 VDC
Summary of Contents for AGCO Allis 500 Series
Page 1: ......
Page 18: ...1 16 1 General Information Notes...
Page 24: ...2 Troubleshooting Notes 2 6...
Page 36: ...3 Maintenance Maintenance Records 3 12...
Page 46: ...4 Adjustments Notes 4 10...
Page 104: ...8 Steering Component Service Notes 8 10...
Page 120: ...9 Drive Controls Service Notes 9 16...
Page 136: ...10 Transmission Removal Installation Notes 10 16...
Page 138: ...11 Transmission Teardown Notes 11 2...
Page 142: ...11 Transmission Teardown Notes 11 6...
Page 164: ...11 Transmission Teardown Notes 11 28...
Page 174: ...13 Seat Seat Deck Service Notes 13 6...
Page 178: ...14 PTO Clutch Service Notes 14 4...