FEC920: USER GUIDE
Page 204
September 18
8.
Operate the Scroll key to highlight ‘Add new wire’, then again to display the top level parameter list.
9.
Use the down arrow button to highlight ‘Channel’ and operate the scroll button.
10. Operate the scroll button to select ‘1’.
11. Highlight ‘Alarm 1’ and operate the scroll button.
12. Use the down arrow button to highlight ‘Active’. Operate the Scroll button again, and create the new wire.
13. Use the Page button twice to return to the Virtual Channel 3 menu.
Figure 132 Wiring a counter: part 2
14. At Virtual Channel.3.Main, use the down arrow to select ‘Preset’. Press and hold the scroll key. The top
level User Wiring page appears.
15. Use the up (or down) arrow button to select the ‘From Source’ tab, if not already selected.
16. Operate the Scroll key to highlight ‘Add new wire’, then again to display the top level parameter list.
17. Use the down arrow button to highlight ‘Channel’ and operate the scroll button.
18. Use the down arrow button to highlight ‘2’ and operate the scroll button.
User Wiring
To Destination
From Source
Add new wire
Virtual Channel.3.Main.Trigger
User Wiring
Virtual Channel.3.Main.Trigger
User Wiring
Virtual Channel.3.Main.Trigger
User Wiring
Virtual Channel.3.Main.Trigger
User Wiring
To Destination
From Source
Add new wire
Virtual Channel.3.Main.Trigger
Instrument
Network
Group
Channel
Virtual Channel
Loop
Digital I/O
Instrument
Network
Group
Channel
1
2
3
Channel
User Wiring
Virtual Channel.3.Main.Trigger
1
Main
Trend
Alarm1
Alarm2
2
Alarm1
Type
Status
Threshold
Dwell
Acknowledge
Active
Create New Wire?
Cancel
Ok
Channel.1.Alarm1.Acktive
A5E45696052A Rev-AA