4.2.2
Scope of delivery
The scope of delivery includes the following components:
● Power unit, incl. closed-loop control
● Excitation cabinet (for synchronous motors only, can be ordered separately)
● Re-cooling unit (optional)
This documentation relates to the complete system without the re-cooling unit.
4.2.3
Checking shock and tilt indicators
The purpose of shock and tilt indicators
The unit is equipped with shock and tilt indicators to monitor for damage during transit. It is
essential that you check the shock and tilt indicators before commissioning the unit.
WARNING
Tripped shock and tilt indicators
Safe operation of the device is not guaranteed if the shock or tilt indicator has tripped
(responded)
This can result in death, serious injury or material damage.
● If one of the indicators has tripped, do not perform any commissioning.
● Inform the Technical Support. Only specialist Siemens technicians can recommend
appropriate measures.
See also
Preparations for use
4.2 Inspections when receiving the delivery
SINAMICS SM150 6SL3845-7NN46-7AA0
84
Operating Instructions 04/2017
Summary of Contents for SINAMICS SM150
Page 2: ...20 04 2017 13 53 V27 00 ...
Page 14: ...Table of contents SINAMICS SM150 6SL3845 7NN46 7AA0 14 Operating Instructions 04 2017 ...
Page 122: ...Start up SINAMICS SM150 6SL3845 7NN46 7AA0 122 Operating Instructions 04 2017 ...
Page 190: ...Maintenance 9 7 Repairs SINAMICS SM150 6SL3845 7NN46 7AA0 190 Operating Instructions 04 2017 ...
Page 192: ...Spare parts SINAMICS SM150 6SL3845 7NN46 7AA0 192 Operating Instructions 04 2017 ...
Page 196: ...Service Support SINAMICS SM150 6SL3845 7NN46 7AA0 196 Operating Instructions 04 2017 ...
Page 217: ......