93 / 176
Siemens
Web server OZW772... V6.0
CE1C5701en
Building Technologies
"Energy indicator" function
2015-10-12
7.3.5 Activating "Data point monitoring"
Monitoring "Energy indicator" data points is activated automatically following device
list creation.
Data point monitoring can thus be activated only following deactivation; see
Section 7.3.4.
Activation for "Data point monitoring" requires "Administrator" access rights.
The checkbox in the "Energy indicator" column allows for activating monitoring
of one or multiple data points e.g. following temporary deactivation.
Data point monitoring deactivated (by user)
Data point monitoring activated
Selecting the checkbox activates the data points for the selected device.
Selecting the summary checkbox (green/red, bottom row) activates the data points
for the plant.
Selecting the checkbox activates the data points for the selected partial plant.
Monitoring is deactivated for partial plant "Room 2". As a result, all data points
are deactivated.
Partial plant "Room 2" is deactivated.
"Monitored data points" 0 of 8.
Data points "Room 2" are deactivated.
Selecting the checkbox for partial plant "Room 2" activates it. As a result, all data
points at the "Data points" level are also activated.
Partial plant "Room 2" is reactivated.
All data points of "Room 2" are reactivated.
Activation
"Plant" level
"Partial plants" level
Example