Record consumption data
2015-10-12
·
The user determines the read time for consumption data file via file transfer.
With daily readings, the user can read the Web Server value up to 24 hours
after the Web Server reading.
·
The consumption data file is sent by e-mail as soon as the consumption data
is collected.
·
Via the chain (1) (3) (5) (6), the current values for WRI982 pulse meters are
a maximum of 5 hours old plus read delay.
·
Via the chain (2) (3) (5) (6), the current values for M-bus meters are a maximum
of 8 hours old plus read delay.
·
Via the chain (4) (5) (6), the current values for the pulse meters to Synco 700
controllers feature only the read delay.
The current value timestamp is written as follows to the consumption data file:
·
For WRI982 pulse meters: Added up hourly by WRI982.
·
For M-bus meters
without
a manufacturer-specific timestamp: by QAX9…,
at read time QAX9…/WRI982.
·
For M-bus meters with a manufacturer-specific timestamp: by the M-bus meter
at the manufacturer-specific time.
·
For Synco 700 pulse inputs: By Synco 700 controller, added up every 5
minutes.
Monthly values are transmitted every 24 hours.
The monthly values are transmitted on the third day of the month between 5 am
and 10 pm.
Not all M-bus meters form their own monthly values. If not, the QAX9… assumes
the task.
The Synco 700 controller forms its own monthly value. The reading takes place
on the third day of the month between 5 am and 10 pm.
The OZW772… does not have an S-Mode input for monthly values and therefore
does not provide any. The entry in the consumption data file remains blank.
The due day values of meters connected to the QAX9… are formed on the
centralized due day. The due day for QAX9… is active in the default state (Default
setting of December 31), but can be edited on the QAX9… or via Web Server (see
Section 2.5.3.6 "Consumption data").
Please note the following, however:
·
A temporary due day value is formed during the commissioning of the QAX9…:
This is the start value of the meter using the start value date.
·
The first due day value is formed using the due day date if the centralized due
day is reached for the first time.
·
Due days that differ from the centralized due day (by the corresponding M-bus
meters) are blocked accordingly.
·
A due day value is used for precision only if one M-bus meters supplies a due
day value on the centralized due day.
OZW772…
à
Reading
Summary
Current value time stamp
Monthly values
WRI982
à
QAX9…
QAX9…
à
OZW772…
Note
Synco 700
à
OZW772…
S-Mode
à
OZW772…
Due day
Due day formation