2-12
Installation
• Check the trouble list on the MKB for
troubles on the devices that were just
added. The troubles will be from among
the following (See Appendix J for a
complete list of Trouble Messages):
Device multiple response
Input device not responding
Incorrect device ID
Unspecified device responding
• Identify the addresses of the devices
with troubles and eliminate them, reset
the system, and verify that the troubles
have cleared before proceeding.
Modify your test configuration by adding
to it the analog devices that are con-
nected to analog loop 2.
• Turn off the power and connect the field
wiring to analog loop 2 on the SMB-2.
• Turn on the power. Wait for the System
to initialize (approximately 3 minutes).
• Check the trouble list on the MKB for
troubles on the devices that were just
added. The troubles will be from among
the following (See Appendix J for a
complete list of Trouble Messages):
Device multiple response
Input device not responding
Incorrect device ID
Unspecified device responding
• Identify the addresses of the devices
with troubles and eliminate them, reset
the system, and verify that the troubles
have cleared.
5. MOM-2/4 Optional Modules Checkout
Remove all system power
before installing any
optional module
(ALD-2I, CMI-300, CRM-4,
CSM-4, CZM-4, NIM-1W).
Unpack each module just before installa-
tion. Inspect the module, looking for such
things as integrated circuits (ICs) not firmly
seated in their sockets, bent IC pins,
connectors not properly installed, dirt, and
packing material on the board.
To install the card guide that comes with
the CRM-4 and the CSM-4 module:
a Loosen the appropriate screw in the
center of the MOM-2/4 and set the card
guide in place.
Make sure that the locating pin on the
bottom of the card guide is in the hole on
the MOM-2/4.
b. Tighten the screw on the MOM-2/4 to
secure the card guide.
6. ALD-2I Checkout
Installing the ALD-2I
Set the address of each ALD-2I. Refer to
the CSG-M printout of the final configura-
tion for the address to which each ALD-2I
should be set. Refer to the ALD-2I Installa-
tion Instructions (P/N 315-091464) to set
the address dipswitch.
Install the ALD-2Is one at a time by insert-
ing them in the appropriate card guides on
the MOM-2/4. Make sure that the card is
firmly seated in the card edge connector.
Eliminate all troubles from each module
before installing the next one.
Modify your test configuration by adding to
it any initiating devices that are connected
to the first analog loop on the ALD-2I.
Turn off the power; connect the field wiring
to analog loop 1 on the ALD-2I. Turn on
the power.
• Turn off the power and connect the field
wiring to analog loop 1 on the SMB-2.
• Turn on the power. Wait for the System
to initialize (approximately 3 minutes).
• Check the trouble list on the MKB for
troubles on the devices that were just
added. The troubles will be from among
Summary of Contents for MXL-IQ
Page 50: ...2 20 Installation ...
Page 126: ...A 2 Appendix A ...
Page 128: ...B 2 Appendix B ...
Page 138: ...F 4 Appendix F ...
Page 140: ...G 2 Appendix G ...
Page 142: ...H 2 Appendix H ...
Page 154: ...K 2 Appendix K ...
Page 162: ...L 8 Appendix L ...
Page 166: ...M 4 Appendix M ...
Page 168: ...N 2 Appendix N ...
Page 178: ...Index 6 Index ...