4-3
ET 200L, ET 200L-SC and ET 200L-SC IM-SC Distributed I/O Device
EWA 4NEB 780 6009-02c
4.2
Commissioning the ET 200L and Smart Connect
Commission the ET 200L distributed I/O device as follows:
Step
Activity
Explanation
1
Install and wire up the ET 200L.
You will find detailed instructions on instal-
ling and wiring in Chapters 2 and 3.
2
Set the PROFIBUS address of the ET 200L.
The two rotary switches used to set the
PROFIBUS dd
l d b th
3
Clip the bus connector on the electronics
block.
y
PROFIBUS address are concealed by the
bus connector (refer to Section 2.6).
4
If you are using an ET 200L-SC or
ET 200L-SC IM-SC, you can now connect the
Smart Connect.
Use the enclosed Smart Connect cable set
for this purpose.
5
Turn on the power supply for the ET 200L.
Result:
The ET 200L starts up automatically.
–
6
If you are using an ET 200L-SC or
ET 200L-SC IM-SC, turn on the power supply
of the Smart Connect SC and ET 200L-SC.
Result:
The ET 200L-SC or ET 200L-SC IM-SC and
Smart Connect SC starts up automatically.
The power supply of the Smart Connect
SC must not be turned on after that of
the ET 200L-SC or ET 200L-SC IM-SC.
Note
Full operational safety of the electronics blocks is not ensured until you have
applied the labeling strips to the front of the electronics blocks (electrostatic
discharge at the front of the module, LED coverage).
Commissioning
the ET 200L
Commissioning