83/219
Building Technologies
Basic Documentation LMV27...
CC1P7541en
9 Connection to load controllers
17.12.2018
Multistage operation X5-03 (stage 2, pin 3 / stage 3, pin 2)
In multistage operation, 1 or 2 thermostats can be connected to activate the different
burner stages. Multistage operation is possible only when firing on oil.
If neither input
Stage 2
nor input
Stage 3
is active, the burner switches to
Stage 1
.
If input
Stage 2
becomes active, the burner switches to the second stage.
If input
Stage 3
becomes active, the burner switches to the third stage. In that case,
input
Stage 2
can be active or inactive. The third stage can only be activated with 3-
stage operation.
LMV...
Bild 317e/0913
X5
-0
3
L
ON/OFF
Load controller (LR) (OPEN)
Load controller (LR) (CLOSED)
Load controller (LR) (ON/OFF)
Figure 60: 2-stage operation X5-03
LMV...
Bild 318e/0913
X5
-0
3
L
ON/OFF
Load controller (LR) (OPEN)
Load controller (LR) (CLOSED)
Load controller (LR) (ON/OFF)
Figure 61: 3-stage operation X5-03