5.1.1
Safety of measuring probes suitable for Ex zones................
28
5.2
5.3
Material required......................................................................................
28
5.4
Preparing the sampling point...................................................................
29
5.5
29
5.6
Installation sequence...............................................................................
30
5.6.1
Installation example................................................................
30
5.6.2
Overview of the installation steps (duct-side preparation)...
31
5.6.3
Installing the flange with tube................................................
31
5.6.4
Installing the connection unit.................................................
32
5.6.4.1
Installing the Ex interface relay (for version 2G)... 32
5.6.4.2
Protective gas outlet...............................................
33
5.6.5
Installing the Ex purge air unit................................................
34
6
Electrical installation........................................................................ 35
6.1
Electrical installation safety information.................................................
35
6.2
Connection overview................................................................................
37
6.2.1
Connection diagram for version 2G........................................ 37
6.2.2
Connection diagram for version 3G........................................ 38
6.3
Connecting interfaces .............................................................................
38
6.3.1
Connecting I/O interfaces (option).........................................
38
6.3.1.1
Connection diagram for variant 2G.......................
40
6.3.1.2
Connection diagram for variant 3G.......................
41
6.3.1.3
Default values for interfaces.................................. 42
6.4
Electrical connection of SR-unit...............................................................
44
6.5
Connecting the potential equalization....................................................
44
6.6
Connecting the potential equalization to the SR-unit............................. 45
6.7
Connecting the connection hose to the SR-unit on the junction box....
45
6.8
Connecting pressure, temperature and purge air monitor....................
46
6.9
Preparing the power supply.....................................................................
47
6.10 Connecting the Ex peripherals (control unit)..........................................
48
7
Commissioning.................................................................................. 49
7.1
Safety information for start-up................................................................. 49
7.2
Material required .....................................................................................
51
7.3
Overview of start-up steps.......................................................................
52
7.4
Installing the device flange on the purge air fixture...............................
53
7.5
Aligning the measuring probe in flow direction......................................
54
7.6
Connecting protective gas to the SR-unit................................................
54
7.6.1
Feeding protective gas............................................................
55
7.7
Start-up of the purge air supply...............................................................
55
7.8
Installing the measuring probe in the gas duct......................................
58
7.9
Installing the SR-unit on the device flange.............................................
59
7.10 Optical fine alignment of the SR-unit .....................................................
60
7.11 Installing weatherproof covers (option)...................................................
61
CONTENTS
4
O P E R A T I N G I N S T R U C T I O N S | GM32-Ex
8015558/YYJ8/V1.7/2016-07 | SICK
Subject to change without notice