24
INSTALLATION
Installation of the front derailleur
Band type
1
(A)
Install the front derailleur to the frame.
Temporarily fix the clamp bolt
(A)
with
an Allen key.
(A)
Clamp bolt
2
(B)
(C)
(a)
Position the front derailleur so that the
flat part of the chain guide outer plate
(B)
is directly above and parallel to the
largest chainring
(C)
.
Check that the distance
(a)
from the tip
of the teeth of the largest chainring is 1
to 3 mm.
After adjusting the position, tighten the
clamp bolt to the designated torque.
(B)
Chain guide outer plate
(C)
Largest chainring
Tightening torque
5 - 7 N·m
{44 - 61 in. lbs.}
NOTE
Do not position the chain guide as shown in
the illustration.
Summary of Contents for XTR Di2
Page 14: ...INSTALLATION ...
Page 42: ...How to operate ...
Page 50: ...ADJUSTMENT ...
Page 70: ...CHARGING THE BATTERY ...
Page 76: ...ConnectionandcommunicationwiththePC Connection and communication with the PC ...
Page 82: ...MAINTENANCE ...