6.1
Outline
29
Power Supply Unit
INSTRUCTION MANUAL
6
6.1.2 Operation Flowchart
Fig. 6-1
Start-up Preparation Flowchart
Pump internal
pressure < 200 Pa
NO
YES
NO
YES
Start-up preparation complete
(LOCAL operation)
REMOTE
operation
LOCAL
operation
Pump internal
pressure < 200 Pa
Start-up preparation complete
(REMOTE operation)
Backing vaccum pump
operates.
Turn POWER switch from
0 (OFF) to 1 (ON).
Start cooling water.
(for cooling water method)
Set the REMOTE/LOCAL
selection switch to LOCAL.
Set the REMOTE/LOCAL
selection switch to REMOTE.
Turn POWER switch from
0 (OFF) to 1 (ON).
"REMOTE" signal output ON.
Backing vaccum pump
operates.
Start-up preparation flowchart
Start cooling water.
(for cooling water method)
Summary of Contents for EI-D1003M
Page 9: ...viii 263 13228 This page is intentionally left blank...
Page 19: ...SECTION 1 OUTLINE AND DESCRIPTIONS 6 263 13228 1 This page is intentionally left blank...
Page 20: ...2 2IDENTIFICATION AND FUNCTION 2 1 Power Supply Unit...
Page 23: ...SECTION 2 IDENTIFICATION AND FUNCTION 10 263 13228 2 This page is intentionally left blank...
Page 24: ...3 3CONSTRUCTION AND PRINCIPLE 3 1 Power Supply Unit...
Page 26: ...4 4SPECIFICATIONS 4 1 Power Supply Unit 4 2 Standards Fulfilled...
Page 39: ...SECTION 5 INSTALLATION 26 263 13228 5 This page is intentionally left blank...
Page 77: ...SECTION 6 OPERATION 64 263 13228 6 This page is intentionally left blank...
Page 91: ...SECTION 7 TROUBLESHOOTING 78 263 13228 7 This page is intentionally left blank...
Page 119: ...Appendix A COMMUNICATIONS A 28 263 13228 A This page is intentionally left blank...