Chapter 3 Basic Instructions
3-9
3.4 Attaching Load Cells
Replace or attach load cells according to the following procedure.
1) Switch the AGS-X power OFF.
2) Remove any jigs attached to the load cell.
3) Loosen the two fastener screws on the CAL cable connector on the right side of the
AGS-X unit and remove the screws along with the CAL cable.
4) Loosen the load cell fastener bolts using the rotation bar, then lift the load cell with one
hand while removing the fastener bolts with the other hand.
5) Attach the desired load cell to the crosshead using the load cell fastener bolts, so that its
cable comes out to the right side, as viewed from in front of the crosshead. Tighten the
bolt with a torque is as follows.
Load Cell Capacity
Torque (N
・
m)
Load Cell Capacity
Torque (N
・
m)
1N
0.2
200N
2.2
2N
0.2
500N
4.5
5N
0.4
1kN
4.5
10N
0.4
2kN
22.5
20N
0.6
5kN
30
50N
0.6
10kN
30
100N
1.1
CAL Cable
Fastener Screws (two)
Right Side of AGS-X Unit
Crosshead
Summary of Contents for AGS-100NX
Page 2: ...This page is intentionally left blank...
Page 16: ...Before Using the System xiv This page is intentionally left blank...
Page 20: ...Contents xviii This page is intentionally left blank...
Page 21: ...1 1 Chapter 1 Overview CONTENTS 1 1 Introduction 1 2 1 2 AGS X Unit Specifications 1 3...
Page 38: ...Chapte 2 Part List Specifications 2 12 This page is intentionally left blank...
Page 56: ...Chapter 3 Basic Instructions 3 18 This page is intentionally left blank...
Page 118: ...Chapter 5 Performing Tensile Tests 5 12 This page is intentionally left blank...
Page 126: ...Chapter 6 Performing Compression and Bending Tests 6 8 This page is intentionally left blank...
Page 130: ...Chapter 7 Method Files 7 4 This page is intentionally left blank...
Page 134: ...Chapter 8 Control Input Output 8 4 This page is intentionally left blank...
Page 142: ...Chapter 9 Sensor Input Output 9 8 This page is intentionally left blank...
Page 146: ...Chapter 10 Maintenance and Inspection 10 4 This page is intentionally left blank...