SP LINK | Configuration Settings
Doc #OI0005 Rev26 2020
|
49
Generator Schedule Start
Some people have predictable times when they require a generator to run, such as when a regular plant
watering routine requires pumps to run, the program contains the ability to predetermine four different
schedules.
Each of the four Schedules (specified as Sched. x in the following examples) can
be enabled or disabled.
Using
Sched. x Day
you can choose a day of the week, all weekdays, all
weekends or everyday (All).
Summary of Contents for SP PRO 2i Series
Page 1: ...Instruction Manual for SP LINK Configuration and monitoring for SP PRO series 2i ...
Page 31: ...SP LINK Using SP LINK Doc OI0005 Rev26 2020 31 Blank Page ...
Page 91: ...SP LINK Performance Monitoring Doc OI0005 Rev26 2020 91 BLANK PAGE ...
Page 97: ...SP LINK Service Settings Doc OI0005 Rev26 2020 97 Blank Page ...