SP LINK | Performance Monitoring
72
|
Doc #OI0005 Rev26 2020
1
2
3
4
5
6
7
8
9
10
11
12
13
Quick View
Quick View presents you with a screen that mimics the front panel of the SP PRO along with a real time
overview of the condition of the system.
The following page lists the SP PRO control and indicators which correspond to the labelled image above.
The overview shown is for a Solar Hybrid (On Grid) system. The real time overview values shows how much
power is being produced (AC Solar) and exported (Export Power and Export Today) as well as the present
consumption (AC Load Power and AC Load Today). The battery condition (Battery SoC and Battery Voltage) is
also indicated.
The overview for a Off Grid system varies slightly such that the Export Power and Export Today are replaced by
the Generator Status and Gen Started.
DC shunts are enabled in this example and their real time values are shown as Solar (Shunt 1) and Load
(Shunt 2).
Summary of Contents for SP PRO 2i Series
Page 1: ...Instruction Manual for SP LINK Configuration and monitoring for SP PRO series 2i ...
Page 31: ...SP LINK Using SP LINK Doc OI0005 Rev26 2020 31 Blank Page ...
Page 91: ...SP LINK Performance Monitoring Doc OI0005 Rev26 2020 91 BLANK PAGE ...
Page 97: ...SP LINK Service Settings Doc OI0005 Rev26 2020 97 Blank Page ...