SP LINK | Configuration Settings
54
|
Doc #OI0005 Rev26 2020
Solar Hybrid Control Settings
The Solar Hybrid Control settings are enabled when the Unit Application is set to Solar Hybrid (On Grid) and
SoC Control is Enabled. They allow the system designer to determine when a defined amount of stored battery
energy is utilised in conjunction with the connected renewable energy sources to optimise their use. Optimum
use of the renewable and stored battery energy gives the SP PRO control over when and the amount of grid
energy, if any, is required to power the connected loads. Using the settings below provides this flexibility.
PRIORITY 1 to PRIORITY 8
The Solar Hybrid Control is made up of eight groups of identical settings with each assigned and labelled a
priority level from 1 to 8 with priority 1 being the highest. If two or more Priority Schedules are active at the
same time, only the highest priority settings will apply.
When a Priority schedule is active, all of its configuration options are active during that time. To see what
Priority group is active and the limits that currently apply, see the SYSTEM REGULATION STATUS under the
DATA VIEW NOW display..
The following configuration options are common to all of the Priority schedules
ACTIVATION
controls when the limits and controls set for that
Priority schedule become operational.
ACTIVATION is divided
into two sections:-
Enable Date and Time Activation
setting. Use
Begin Date
and
End Date
to set the inclusive date range over which you
want this Priority Schedule to be active. By default the range
is all year and only requires adjustment if part of a year such
as summer is required.
Day
selects the days of the week (Mon, Tues, ..., Sat-Sun,
Mon-Fri, All) when the schedule to be active.
Select the
Start Time
and
Stop Time
(in 24 hr format) for the
schedule to be active. If the
Stop Time
is earlier than the
Start Time
then the
Stop time
is for the following day. If the
following day is not selected in the Day or Date setting then the
schedule will stop at midnight on the last selected day.
The digital input set in
Activation Input
is also used to activate the Priority schedule.
This input will activate the Priority schedule regardless of the Date Time Activation.
When set to “Rising” the Priority will be active when the input is high and inactive
when the input is low. A “Falling” setting will control the priority in the opposite sense..
Both Activation types (Date/time and Digital Control) can be used together
remembering if one or the other is active then the Priority Schedule will be active.
During Activation, the output set in
Active Output
will be energised and can be used
to signal other devices or to drive other inputs in the SP PRO.
Summary of Contents for SP PRO 2i Series
Page 1: ...Instruction Manual for SP LINK Configuration and monitoring for SP PRO series 2i ...
Page 31: ...SP LINK Using SP LINK Doc OI0005 Rev26 2020 31 Blank Page ...
Page 91: ...SP LINK Performance Monitoring Doc OI0005 Rev26 2020 91 BLANK PAGE ...
Page 97: ...SP LINK Service Settings Doc OI0005 Rev26 2020 97 Blank Page ...