SP LINK | Using SP LINK
Doc #OI0005 Rev26 2020
|
9
Site Configuration Wizard
Provides a quick and easy way to configure a SP PRO in a new installation. The configuration information can
be created and saved to a Site file ready for sending to the inverter as required.
The wizard steps through the configuration process and informs the system designer at each step of any invalid
configuration or limitations of the chosen components.
The Site configuration wizard a powerful system validation tool. Just enter your proposed system
details and the wizard will validate your design at each step.
The wizard is self explanatory. A description of each screen is given below
New Site Configuration Details
Enter a unique and descriptive name for the site where the
SP PRO is installed. This name will be used to store and
retrieve the information at a later date.
Single Inverter / Powerchain System
. Select the system
Configuration, Single Inverter or Powerchain system (Three
phase, Split phase or multi inverter single phase).
Inverters per phase
: Enter the number of SP PROs that
are connected to each phase. For example in a three phase
configuration with 6 SP PROs, there will be 2 inverters per
phase. In a single phase configuration with 3 inverters there
will be 3 inverters per phase.
Select a Detected USB Device
: If the computer USB port is
plugged into a powered up SP PRO then its model number
and serial number will be displayed. Select this option.
Manual Configuration
: If there is no SP PRO connected
then select the SP PRO model number.
Select Battery Configuration
Standard Battery Configurations and myGrid Kits
offers choices of myGrid kits and other specific battery
configurations, such as LG Chem.
Otherwise select
Custom Battery Configuration
to
manually enter the battery information.
Once the battery type is chosen the battery State of Charge
levels are chosen (except for No Battery option).
SoC Support Limit
(Support Capacity) sets the energy that
is available for normal daily operation. If the system is Off
Grid with an auto start generator, then this is the SoC level at
which the generator will start This value is dependant on the
battery type and its expected cycle life.
Inverter Shutdown SoC
(Minimum Backup Capacity) sets
the energy available during either a grid outage (for Solar
Hybrid) or when the generator fails to start (for off grid).
Summary of Contents for SP PRO 2i Series
Page 1: ...Instruction Manual for SP LINK Configuration and monitoring for SP PRO series 2i ...
Page 31: ...SP LINK Using SP LINK Doc OI0005 Rev26 2020 31 Blank Page ...
Page 91: ...SP LINK Performance Monitoring Doc OI0005 Rev26 2020 91 BLANK PAGE ...
Page 97: ...SP LINK Service Settings Doc OI0005 Rev26 2020 97 Blank Page ...