Segway Personal Transporter SE Service Manual
14–2
Powerbase Chassis
Powerbase Chassis
The inset in
shows the numeral 2 and an arrow
stamped on the Chassis to indicate the front of the Chassis.
Disassembly
1. Make sure the PT is powered off, unplugged, and the
batteries have been removed.
2. Establish a Serviceable Powerbase (
3. Remove both Gearboxes (
).
4. Remove the Radio Board (
5. Remove the Console (
6. Remove the Chassis Cover (
7. Remove both CU Boards (
).
8. Remove the Balance Sensor Assembly (
).
9. Remove both Motors (
Reassembly
1. Install both Motors (
2. Install the Balance Sensor Assembly (
NOTICE
Use self-tapping fasteners when installing the BSA
into a new Powerbase Chassis.
3. Install both CU Boards (
).
NOTICE
Use self-tapping fasteners when installing the CU
Boards into a new Powerbase Chassis.
4. Install the Chassis Cover (
5. Install the Console (
).
6. Install the Radio Board (
).
7. Install both Gearboxes (
).
8. Reassemble the PT from the Serviceable Powerbase
).
9. Perform post-service tests (
).
Figure 14–1: Powerbase Chassis
Front
Rear
Summary of Contents for i2 SE
Page 4: ...Segway Personal Transporter SE Service Manual iv...
Page 8: ...Segway Personal Transporter SE Service Manual viii Contents...
Page 28: ...Segway Personal Transporter SE Service Manual 3 4 Batteries...
Page 52: ...Segway Personal Transporter SE Service Manual 8 4 Serviceable Powerbase...
Page 66: ...Segway Personal Transporter SE Service Manual 10 4 Chassis Cover...
Page 70: ...Segway Personal Transporter SE Service Manual 11 4 CU Board...
Page 80: ...Segway Personal Transporter SE Service Manual A 2 Post Service Tests...
Page 88: ...Segway Personal Transporter SE Service Manual D 2 Tools and Equipment...
Page 90: ...Segway Personal Transporter SE Service Manual E 2 Glossary...
Page 91: ......
Page 92: ...24019 00001 aa...