Segway Personal Transporter SE Service Manual
13–2
Motor
Removal
Tools Required:
Small flathead screwdriver
T-25 6-lobe wrench
1. Make sure the PT is powered off, unplugged, and the
batteries have been removed.
2. Establish a Serviceable Powerbase (
3. Remove the Radio Board (
4. Remove the Console (
5. Remove the Chassis Cover (
6. Remove the Gearbox on the same side of the PT as
the Motor you want to remove (
7. Disconnect the two CU motor harnesses from the
motor. Using a small flathead screwdriver, gently lift
the tab on the connector, then carefully pull on the
connector to unseat it. See
8. Using a T-25 6-lobe wrench, remove the two
fasteners attaching the Motor to the Chassis. See
.
9. Pull the Motor straight out of the Chassis.
Motor
Figure 13–1: CU Motor Harnesses
Summary of Contents for i2 SE
Page 4: ...Segway Personal Transporter SE Service Manual iv...
Page 8: ...Segway Personal Transporter SE Service Manual viii Contents...
Page 28: ...Segway Personal Transporter SE Service Manual 3 4 Batteries...
Page 52: ...Segway Personal Transporter SE Service Manual 8 4 Serviceable Powerbase...
Page 66: ...Segway Personal Transporter SE Service Manual 10 4 Chassis Cover...
Page 70: ...Segway Personal Transporter SE Service Manual 11 4 CU Board...
Page 80: ...Segway Personal Transporter SE Service Manual A 2 Post Service Tests...
Page 88: ...Segway Personal Transporter SE Service Manual D 2 Tools and Equipment...
Page 90: ...Segway Personal Transporter SE Service Manual E 2 Glossary...
Page 91: ......
Page 92: ...24019 00001 aa...